![]() Remove the packing tape from foam and pull the top foam away from the AC unit. 2 Tip the pallet with AC unit (in foam) upright so that the casters are now on the floor. Remove the LCD monitor, 3D camera, battery, accessories and all packing materials from the top foam. V2.1 JanuaryĦ MODULE 1- UNPACKING AND SETUP CEREC AC (BLUECAM OR OMNICAM) 1 Remove outer carton. ![]() ![]() CEREC SYSTEM INSTALLATION MODULE 1- UNPACKING AND SETUP AT BRANCH.6 MODULE 2- SOFTWARE UPDATES.13 > OMNICAM TRADE UP CHECKLIST.14 MODULE 3- SOFTWARE LICENSING 19 MODULE 4- DEVICE COMMUNICATION MODULE 5- CALIBRATING AND TESTING MODULE 6- DELIVERING THE SYSTEM MODULE 7- ON-SITE INSTALLATION.47 ineos X5 inlab SYSTEM INSTALLATION MODULE 1- UNPACKING AND SETUP AT BRANCH MODULE 2- SOFTWARE UPDATES MODULE 3- SOFTWARE LICENSING MODULE 4- DEVICE COMMUNICATION MODULE 5- CALIBRATING AND TESTING MODULE 6- DELIVERING THE SYSTEM MODULE 7- ON-SITE INSTALLATION APOLLO DI UNPACKING AND SETUP.89 APPENDIX 1: DATA FOLDER CONFIGURATION APPENDIX 2: NETWORK IP ADDRESS CONFIGURATION APPENDIX 3: TYPICAL SIRONA IP ADDRESSES APPENDIX 4: APPROVED CLEANING AND DISINFECTING 98 APPENDIX 5: LINKSYS WAP SETTINGS APPENDIX 6: ONLINE PM REGISTRATION APPENDIX 7: H&W CONFIGURATION FOR SERIAL PORTS.107 APPENDIX 8: CAD/CAM SUPPORT FLOWCHART V2.1 Januaryĥ CEREC SYSTEM FACTORY CONFIGURED INSTALLATION This guide provides step-by-step instructions on installing a factory configured system with a CEREC AC and a CEREC milling unit. 1 Covering CEREC and inlab CAD/CAM Systems V2.1 January 2014ģ CONTENTS Description Page No. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |